BUSINESSES AND ORGANIZATIONS
Designed for businesses, municipalities, and public and private organizations.
Vehicle Fleet Analysis Project
Amount
75% of eligible expenses, up to $30,000 per building
Purpose
Energy analysis of a vehicle fleet, charging needs, solution design, feasibility, and cost optimization
Payment
In a single payment
Date of expenses
After January 1, 2024
ELIGIBLE EXPENSES
- Characterization and energy analysis of a vehicle fleet
- Analysis of charging needs and vehicles
- Design of charging solutions
- Energy assessment and analysis of existing infrastructure
- Feasibility study and equipment optimization
- Assessment of energy costs and opportunities for optimization
Link :
Project to Install Charging Stations at a Company
Amount
50 % of eligible expenses
Maximum for Level 2 charging stations
Twice the purchase cost of the charging station
Maximum for BRCC charging stations
The purchase cost of the charging station
Maximum per site
500 000 $ per site and per business
Payment
In a single payment (or 3 installments for large-scale projects > $150,000)
ELIGIBLE EXPENSES
- Purchase and shipping of eligible charging stations (Level 2 and BRCC)
- Labor and materials for installation and connection
- Commissioning of the station
- Energy management system for charging
- Plans and estimates for infrastructure installation
- Repair of surfaces damaged during construction
- Protective bollards for charging stations
- Over-engineering of infrastructure for future needs
NON-ELIGIBLE EXPENSES
- Spare parts and maintenance costs
- Temporary connection fees
- Weather shelters
- Network management, maintenance, and extended warranty fees
- Parking lot improvements (except for restoration)
- Generators, batteries, solar panels, or energy storage
- Taxes and administrative fees
Link :
Large-scale projects (>$150,000): A funding option is available during the project, with payments made in three installments. Contact:
ecorecharge@environnement.gouv.qc.ca
SUMMARY TABLE – ELIGIBLE AMOUNTS
Home
Homeowner (single-family home, townhouse, duplex) — Flat rate — $600
Single-Family Multi-Unit Housing
EV Resident in a Building — Variable — $5,000
Multi – Analysis
Building Manager/Owner — 75% — $5,000/building
Multi – Infrastructure
Building Manager/Owner — 50% — $120,000/building
Multi – Charging Station Installation
Building manager/owner — Flat rate — $600/charging station
Business – Analysis
Business, municipality, organization — 75% — $30,000/building
Business – Installation
Business, municipality, organization — 50% — $500,000/site
Official program link:
https://www.quebec.ca/transports/transport-electrique/aide-financiere-ecorecharge